Näpunäited riskiregistriks

Kirjuta risk stsenaarium + mõju, mitte hägused sildid.

Üks omanik riski kohta.

Uuenda jääkriski pärast leevendusi.

Vaata top-riskid üle regulaarsetel koosolekutel.

Seo iga risk konkreetsete tegevustega.

Riskiregistri mall teave

Mall riskiregistrile.

Algdokument: kustuta üleliigne, omanikke pea trackeris.

Kuidas kasutada: Riskiregistri mall

  1. Read the draft

    Open Riskiregistri mall and delete rows that do not apply.

  2. Adapt names and owners

    Put real systems and people before you treat it as done.

  3. Download and track

    Keep it in git or a tracker with evidence links.

Korduma kippuvad küsimused

Is Riskiregistri mall free?

Yes. It is free to use in the browser with no signup required.

Do I need to install anything?

No. Riskiregistri mall is a web utility — open the page and start.

When should I use Riskiregistri mall?

Mall riskiregistrile.